v1.01.221 ZZZZ221 — Validation of a thermo-hydradation chain calculation#

Summary:

The objective of this axisymmetric test case is to verify the calculation of a thermo-hydration chain. The concrete structure studied is composed of two levers.

The main steps in chaining are as follows:

  • Step 1: Thermo-Hydration calculation on the first rise with the operators:

    • DEFI_MATERIAU (THER_HYDR),

    • THER_NON_LINE (COMPORTEMENT =” THER_HYDR “),

  • Step 2: Definition of the initial conditions on the two surveys based on the results of the first survey and initial values for the second survey.

    • CREA_CHAMP (OPERATION =” AFFE “, NOM_CMP =” TEMP”)

    • CREA_CHAMP (OPERATION =” AFFE “, NOM_CMP =” HYDR_NOEU”)

  • Step 3: Thermo-Hydration calculation on the 2 lifts with the operators:

    • DEFI_MATERIAU (THER_HYDR),

    • THER_NON_LINE (COMPORTEMENT =” THER_HYDR “),

Non-regression tests are carried out on temperature and hydration.

This documentation is deliberately brief.