.. _U2.03.06: **u2.03.06** Carrying out a building structure study with prestressed cables ============================================================================= **Summary:** The purpose of this document is to provide advice for carrying out reinforced concrete studies with prestressed cables using dedicated functionalities (DEFI_CABLE_BP/CALC_PRECONT). It provides information on mesh precautions, on the methods of applying prestress and on the possibilities of phasing. .. toctree:: :hidden: self .. toctree:: :maxdepth: 2 :numbered: Introduction Remarque_pr_liminaire Premi_re__tape___le_maillage Deuxi_me__tape___la_mise_en_donn_e_du_probl_me La_r_solution_du_probl_me_m_canique_ Cas_particuliers___relaxation_des_c_bles_et_rupture_des_c_bles Post-traitement Liste_des_cas-tests_de_v_rification_validation Annexe